GTA provided coordination with regulatory agencies and oversight for permitting, collection, treatment, and disposal of about 1.5 million gallons of contaminated water and sediments. GTA prepared specifications for construction dewatering. Find latest and state of the art topics for civil engineering Projects, Seminars, Dissertations and Presentations on Geotechnical Engineering. If you talk to professionals, they will say that the first question that is going to be asked to you if you attend an interview as a fresher, will be about your civil project topic. GTA provided observation and testing during construction, including test nail evaluation. GTA also prepared a geohydrologic model for the site and performed analysis using “ModFlow” to assess the seepage into the excavations and under the foundations after construction. If you don’t want to do much work and you are only after the degree, please excuse, these are not the right topics for you. Thanks for asking Chiranjit Pal, If you are a graduate student and asking for geotechnical engineering project ideas, check these out. GTA monitored settlement and inclination of the buildings using instrumented survey techniques. GTA also provided construction observation and testing services during construction of the wall which required over 40,300 square feet of Keystone Standard 21.5-inch block to achieve its final dimensions of over 1,340 feet long with a maximum exposed height of over 40 feet. GTA designed a permanent shoring system that would also function as a permanent pressure relief wall. Given the limited access underneath the bridge, it was imperative that the subsurface exploration and instrumentation be installed prior to the foundation contractor mobilizing to the site. Find latest and state of the art topics for civil engineering Projects, Seminars, Dissertations and Presentations on Geotechnical Engineering. Find latest and state of the art topics for civil engineering Projects, Seminars, Dissertations and Presentations on Geotechnical Engineering. During the construction of slurry wall, chromium-contaminated groundwater was encountered. GTA’s engineers and scientists worked diligently 24/7 for 12 days in order to obtain the necessary subsurface exploration for the design team. Geotechnics is an engineering discipline that deals with soil and rock behaviour in an engineering perspective. GTA provided geotechnical engineering for the 21-million-gallon water impoundment structure at Wilmington Country Club. See the best examples of environmental engineering projects and geotechnical projects in the Ardaman and Associates, Inc. civil engineering portfolio. Then select a specialized topic out of it, after discussing with your guide. Choosing civil engineering project topic can be crucial step in your career path. Below are some examples of our Geotechnical project experience: “Award of Excellence,” by NAIOP, MD Chapter, High-Rise Office Building, “WaveMaker Award,” by the Urban Land Institute, Baltimore District, “Excellence in Concrete Award,” by ACI, MD Chapter. CivilDigital.com brings you series of uncommon and exclusive civil engineering project topics. You might be selecting your field of study for higher studies based on this topic. In conjunction with our design, GTA performed a geotechnical exploration within the area of the retaining wall to determine the subsurface conditions within the zone of influence beneath the wall. You cannot learn a lot by doing the project if you don’t have a strong and motivating guide. The design included both internal and global stability analyses to assess the long-term stability of the fill and underlying Potomac Clay deposit. Staff engineers performed borehole logging for six Standard Penetration Test borings and approximately 120 feet of rock coring performed by Walton Corporation. GTA also designed an underpinning system to support an adjacent structure. GTA monitoring displacements of adjacent high-rise buildings during deep excavation and construction of the underground parking garage. GTA provided geotechnical services for the construction of a six-level precast concrete parking structure in Lancaster, Pennsylvania. GTA provided emergency response and corrective action services including subsurface exploration and geotechnical engineering services to repair BR1-183 on I-495 over Christina River in June 2014 through its open-ended contract with Walton Corporation. Services included subsurface exploration and well installation, groundwater monitoring, slope stability and seepage analysis, and earthwork recommendations during design and review of the earthwork and engineering consultation during construction. GTA’s services allowed the client to identify and implement cost-effective solutions for geotechnical, environmental, and groundwater control issues. Any building or development project starts from the ground up and requires geotechnical input. This building also includes a five-story below-grade parking garage, which requires a 24-hour dewatering system due to the close proximity to the waterfront. Also monitored inclination of the parking structures slurry walls using inclinometers. Sample Geotechnical Engineering Projects. I’m final year mtech geotechnical engineering student.pls suggest me atopic. GTA assisted the design team in selecting a design that relieves the hydrostatic pressure under the mat that eliminated the need for costly tie-downs. GTA provided geotechnical, environmental assessments and permitting, geohydrological, and construction phase testing and consultation services for the $580 million, Four Seasons Hotel and Legg Mason Office complex in Baltimore’s Inner Harbor. The monitoring also included sampling of groundwater and sediments to assess contamination. GTA supplemented consolidation testing performed by DelDOT’s in-house laboratory by performing unit weights and loss on ignition tests of undisturbed samples, 14 Unconsolidated Undrained Tests and 14 compression tests on rock. Civil PowerPoint Presentations | Civil ppts, Join CivilDigital WhatsApp Groups | Civil Engineering WhatsApp groups, see more topics on geo-technical engineering, Dissertations and Presentations on Geotechnical Engineering, seminar topics for civil engineering students, Ground Improvement Techniques | Complete List of Methods | Classifications, Scaffolding | Scaffold Components | Types. The structural components of the wall took less than two months to construct. You might be selecting your field of study for higher studies based on this topic. Selecting the right project topic has a major impact on your career. Ground Improvement by Dynamic Soil Compaction. The foundation, slurry wall, under-drain system, and mat foundations are constructed for this high-rise hotel/condominium and office building complex with a 22-story hotel and condominium tower encompassing 455,000 SF (with capacity of construction to 45 stories), and a 26-story, 600,000-SF office tower located directly adjacent to the harbor waterfront. GTA provided construction phase testing and observation for structural slurry wall, tie-backs, mat foundations, and underdrain system. The underpinning design used a pit system that extended to depths of up to 7 feet. For the permanent pressure relief wall, GTA designed a soldier pile wall with shotcrete lagging and a soil nail wall with shotcrete facing.